Vacancies
Vacancies > Job Vacancy Announcement Detail
Job Vacancy Announcement Detail
| Employer: | ALTER CITY GROUP INC. |
| DBA: | ALTER CITY GROUP INC. |
| Address: | P.O. Box 505110 Saipan, MP, Northern Mariana Islands 96950 Northern Mariana Islands |
| Phone: | 670-233-4888 |
| Other Number: | |
| Contact ALTER CITY GROUP INC. via email | |
| Job Vacancy Announcement | JVA |
| JVA Type: | New |
| Island | Saipan |
| FLSA Covered? | Yes, covered |
| DOD related? | No |
| PERM related? * | No |
| VEVRAA related? | No |
| Original Number of Openings: | 1 |
| Number of Openings Currently Available | 1 |
| Specific Worksite location: | Garapan, Saipan |
| Job Classification: | Architecture and Engineering Occupations |
| Job Title: | Chief Engineer |
| Announcement Number: | 18-02-55076 |
| Job Classification: | Architecture and Engineering Occupations |
| Opening Date: | 2/13/2018 |
| Closing Date: | 2/28/2018 |
| Salary Range: | $120000 to $140000 / Annually |
| Job Title: | Chief Engineer |
| Job Duties: | Performs complex analytical work in providing office and engineering support and field engineering support for environmental, water, sewer and other public works projects and programs ensuring technical competence and compliance with all current codes and criteria. - Determines work procedures, prepares work schedules and expedites workflow. Issues written and oral instructions. - Assigns duties and examines work for exactness and conformance to policies and procedures. - Studies and standardizes procedures to improve efficiency of subordinates. - Prepares composite reports from individual reports of subordinates. - Adjust errors and resolves complaints. - Prepares and documents budget requests; administers adopted budget in department. - Reviews private project development plans for compliance with codes, regulations and standards, adequacy of applications for permits and compliance with approved plans. - Determines applicable codes, regulations and requirements for assigned projects. - Provides project management for the construction of the municipal public works projects. - Oversees assigned projects to ensure contractor compliance with time and budget parameters for the project. - Coordinates the preparation of/or develops, reviews and updates the sanitary sewer, water, storm drainage and street system maps, databases and comprehensive plans. - Prepares and administers the department budget in assigned area of responsibility. - Maintains the engineering library and infrastructure records. - Assures as-built records of projects and documents necessary changes for the operation and maintenance programs. - Responds to the public or other inquiries relative to engineering procedures on specific projects and other information. - Reviews utility permits, street use permits, franchise utility permits, etc. - Provides intersection signal and channelization design. Develops and maintains a pavement management system. - Performs related duties or responsibilities, as assigned or requested. - Expert in construction of steel structure. |
| High School Diploma Required? | Undetermined |
| Qualification Requirements: | - Bachelor's degree in Structural/Civil Engineering - EXperience in commercial or institutional facilities -Computer experience using MS Office, Trane TRACE or similar software, manufacturer selection software. - Experience with Microsoft Project or related construction design programs. - 5-10 years' experience in mechanical system design of commercial or institutional buildings - Knowledge in recasting structure or similar construction methods - Translate construction plans and reports from English to Mandarin Chinese - Ability to register or become licensed as Engineer to the extent requires by the CNMI Board of Professional Licensing. |
| Full or Part Time: | Full Time |
| Hours per Week: | 40 |
| Hours per Day: | 8 |
| Payment Frequency: | Bi-weekly |
| Overtime Available: | No |
| Overtime Rate: | $0 - $0 |
| Rate x 1.5 per hour Exempted: | Yes |
| Specify All Payroll Deductions: | Standard CNMI and federal taxes. |
| Required tools, supplies and Equipment to be provided: | None |
| Anticipated starting date of employment: | 10/1/2018 |
| Anticipated closing date of employment: | 9/30/2019 |
| Housing Provided: | No |
| Food Provided: | No |
| Transportation required: | No |
| If transportation is required, daily transportation to and from the worksite(s) will be provided to the workers. Daily pick-up place(s) will be at: | N/A |
| Fringe Benefits: | None |
| Comments: | Worker's compensation provided. |